تفاصيل المشروع
Description
The public construction industry in Kuwait has experienced an unexpected boom over the past decade; with number of projects in infrastructural development in the country that were being spurred by high levels of population growth (Arab World Construction 2009).However, the public construction market is fraught with unique set of risks, which should be identified and managed to overcome any unfavorable overruns. This study will identify the significant risks encountered in public construction industry in Kuwait. The risks will then be rated through a questionnaire distributed to local construction companies; including contractors; working or had worked in Kuwait. The overall Relative Importance Index (RII) will be calculated for each risk in terms of frequency, impact on project cost, schedule, performance and company performance. The relationship between the RII of relative frequency and RII of relative impact from different aspects will be examined using the Risk Mapping Matrix (RMM). In addition, by using statistical analyses the effect of these risks on the project overall cost and schedule overruns will be analyzed. Finally, a recommendations for local contractors will be provided to overcome any unfavorable overruns or impact on project performance.
| الحالة | منتهي |
|---|---|
| تاريخ البدء/النهاية الساري | 1/04/15 → 31/03/16 |
بصمة
استكشف موضوعات البحث التي تناولها هذا المشروع. يتم إنشاء هذه الملصقات بناءً على الجوائز/المنح الأساسية. فهما يشكلان معًا بصمة فريدة.