ملخص
This paper demonstrates the application of Genetic Algorithm (GA) techniques in searching and computing an optimum multi-manpower schedule for a construction company over multiple construction projects. The absolute deviations of the required manpower from the allocated manpower biased by the labor wage rate, priority of the project and constrained by certain operational constraints is taken as the objective function for the GA. Lessons learned by this implementation are discussed in this paper. Preliminary result indicates that GA techniques can find optimum or near optimal solutions to similar construction management problems after exploring a very small fraction of the alternatives.
| اللغة الأصلية | English |
|---|---|
| الصفحات | 702-709 |
| عدد الصفحات | 8 |
| حالة النشر | Published - 1997 |
| الحدث | Proceedings of the 1997 4th Congress on Computing in Civil Engineering - Philadelphia, PA, USA المدة: 16 يونيو 1997 → 18 يونيو 1997 |
Conference
| Conference | Proceedings of the 1997 4th Congress on Computing in Civil Engineering |
|---|---|
| المدينة | Philadelphia, PA, USA |
| المدة | 16/06/97 → 18/06/97 |
بصمة
أدرس بدقة موضوعات البحث “Manpower scheduling optimization using genetic algorithms'. فهما يشكلان معًا بصمة فريدة.قم بذكر هذا
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver