ملخص
This paper proposes a novel bundle delivery scheme (BDS) aimed at achieving a delay-minimal bundle delivery in the context of an intermittent roadside network. The realization of this objective is challenging whenever network information is completely unavailable. The concept of virtual space (VS) presents itself as an efficient solution that allows the source to perform necessary data bundle retransmissions to a subset of arriving vehicles. In turn, these vehicles will secure earlier delivery of the retransmitted bundles to the destination. A thorough empirical performance evaluation of the BDS shows that this scheme exhibits a delay improvement of 22.6%-40% relative to other existing schemes.
| اللغة الأصلية | English |
|---|---|
| رقم المقال | 6376195 |
| الصفحات (من إلى) | 700-708 |
| عدد الصفحات | 9 |
| دورية | IEEE Transactions on Intelligent Transportation Systems |
| مستوى الصوت | 14 |
| رقم الإصدار | 2 |
| المعرِّفات الرقمية للأشياء | |
| حالة النشر | Published - 2013 |
بصمة
أدرس بدقة موضوعات البحث “Modeling and delay analysis of a retransmission-based bundle delivery scheme for intermittent roadside communication networks'. فهما يشكلان معًا بصمة فريدة.قم بذكر هذا
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver