!!Projects per year
ملخص
This paper addresses the m-machine no-wait flowshop scheduling problem to minimize makespan. We propose two heuristics that are based on simulated annealing and Genetic Algorithm techniques. We also propose improvement procedures to these heuristics. Extensive computational experiments show that the simulated annealing heuristics outperforms the best two existing heuristics. They also show that the improvement procedures, applied to the Simulated Annealing and Genetic Algorithm, result in significant reduction in error, about 750% error reduction to Simulated Annealing and about 1960% to Genetic Algorithm. An important class of scheduling problems is characterized by a no-wait constraint where jobs have to be processed continuously without waiting between or on consecutive machines. This constraint of no-waiting arises from characteristics of the processing technology itself. This paper proposes efficient Simulated Annealing and Genetic Algorithm heuristics for the m-machine no-wait flowshop scheduling problem to minimize makespan.
| اللغة الأصلية | English |
|---|---|
| الصفحات (من إلى) | 1219-1231 |
| عدد الصفحات | 13 |
| دورية | Computers and Operations Research |
| مستوى الصوت | 30 |
| رقم الإصدار | 8 |
| المعرِّفات الرقمية للأشياء | |
| حالة النشر | Published - يوليو 2003 |
بصمة
أدرس بدقة موضوعات البحث “New heuristics for no-wait flowshops to minimize makespan'. فهما يشكلان معًا بصمة فريدة.المشاريع
- 1 منتهي
-
NO-WAIT FLOWSHOPS WITH SEPARATED SETUP TIMES.
Al-Dowaisan, T. A. (PI) & Allahverdi, A. M. (CoI)
1/07/98 → 28/02/01
المشروع: RESEARCH PROJECT
قم بذكر هذا
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver