Skip to main navigation Skip to search Skip to main content

Dual Criteria No-Wait Flowshop Scheduling Problem with Separate Setup Times

Project: RESEARCH PROJECT

Project Details

Description

Scheduling involving no-wait in process plays an important role in some manufacturing environments. The reason for the occurrence of a no-wait in process is the technology requirements in some manufacturing environments, as in such an environment, an operation should immediately follow the previous one. Scheduling in such an environment is called scheduling with no-wait in process. Many real life problems including plastic industry, which is common in Kuwait, can be modelled as scheduling with no-wait in process. The no-wait flowshop scheduling problem in the literature is mostly investigated in search for optimizing a single criterion. However, many real life applications necessitate more than a single criterion. Moreover, the vast majority of scheduling literature ignores setup times. However, setup times are crucial in many environments including plastic industry. The proposed research will investigate the m-machine no-wait flowshop scheduling problem with dual performance measures of makespan and total tardiness where setup times will be considered as separate from processing times. Some dominance relations will be developed and several heuristics will be constructed. The performance of the constructed heuristics, along with the efficiency of the developed dominance relations, will be evaluated based on randomly generated problems.
StatusFinished
Effective start/end date1/12/16 → 30/11/17

Keywords

  • Scheduling
  • no-wait flowshop
  • setup time
  • makespan
  • total tardiness

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.