INVESTIGATION OF SEPARATE SETUP AND REMOVAL TIMES IN SCHEDULING PROBLEMS.

Project: RESEARCH PROJECT

Project Details

Description

This paper addresses the two-machine flowshop problem where the setup, processing, and removal times of the jobs are separated and are independent of the job sequence. This problem is considered with maximum lateness as a measure of performance. Elimination criteria are established for both the classical and ordered flowshops, and optimal sequences are obtained for special ordered flowshops.

StatusFinished
Effective start/end date1/09/97 → 30/08/98

Keywords

  • Scheduling
  • setup times
  • removal times.