Skip to main navigation Skip to search Skip to main content

Minimizing a Weighted Quadratic Function of Job Lateness in the Stochactic Single Machine Scheduling Problem.

Project: RESEARCH PROJECT

Project Details

Description

We study a static single machine scheduling problem in which processing times, due-dates, and penalties for not completing jobs on time are distinct arbitrary random variables. The objective is to identify an optimal sequence, which minimises the expected weighted sum of a quadratic function of job lateness. The problem is NP-hard to solve; however, based on a precedence relation structure among adjacent jobs, we develop an exact algorithm. Our computational results demonstrate that the algorithm solves large problem instances quickly. Furthermore, the proposed problem is general in the sense that its special cases reduce to some classical deterministic or new stochastic single machine models.

StatusFinished
Effective start/end date1/04/08 → 31/03/09

Keywords

  • Optimization
  • Scheduling
  • Stochastic
  • Production

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.