Project: RESEARCH PROJECT
The assembly flowshop scheduling problem has been addressed recently in the literature. There are many problems that can be modeled as assembly flowshop scheduling problems including queries scheduling on distributed database systems and computer manufacturing. The problem has been addressed with respect to either makespan or total completion time criterion in the literature. In this paper, we address the problem with respect to a due date-based performance measure, i.e., maximum lateness. We formulate the problem and obtain a dominance relation. Moreover, we propose three heuristics for the problem: particle swarm optimization (PSO), Tabu search, and EDD. PSO has been used in the areas of function optimization, artificial neural network training, and fuzzy system control in the literature. In this paper, we show how it can be used for scheduling problems. We have conducted extensive computational experiments to compare the three heuristics along with a random solution. The computational analysis indicates that Tabu outperforms the others for the case when the due dates range is relatively wide. It also indicates that the PSO significantly outperforms the others for difficult problems, i.e., tight due dates. Moreover, for difficult problems, the developed dominance relation helps reduce error by 65%.
| Status | Finished |
|---|---|
| Effective start/end date | 20/08/05 → 19/08/06 |
In 2015, UN member states agreed to 17 global Sustainable Development Goals (SDGs) to end poverty, protect the planet and ensure prosperity for all. This project contributes towards the following SDG(s):
Research output: Contribution to journal › Article › peer-review