!!Research output per year
!!Research output per year
Project: RESEARCH PROJECT
This paper addresses several multicriteria single machine scheduling problems wherein a job processing time is either a convex or linear function of the amount of resource assigned to the job, learning and ageing are job-dependent and position-based, job deterioration linearly depends on the job starting time, and the job's setup time is proportional to the duration of the already processed jobs. The goal is to jointly determine the optimal resource allocations and the optimal sequence with respect to the total resource cost and a composite cost function of some criteria. We formulate the proposed multicriteria problems as constrained and unconstrained combinatorial optimisation models and introduce polynomial time algorithms to derive the optimal solutions.
| Status | Finished |
|---|---|
| Effective start/end date | 1/07/14 → 30/06/15 |
Research output: Contribution to journal › Article › peer-review