Project Details
Description
In this study, we propose a stochastic inventory control model that incorporates the following real-world aspects; randomness in lead time, capacity constraint, and permissible delay in payment policy with down payment. At the outset, we develop three mathematical models; the first of which is a stochastic inventory model when lead time is a random variable which follows a general probability distribution function. In the second model, we add capacity constraint to the first model. The third model, however, generalizes the second model by considering the permissible delay in payments scheme with down payment. Besides, the optimal solutions for the three mathematical models above will be determined by devising appropriate iterative solution methods. We, further, will investigate the performance of the third model by comparing it with a baseline model where the total unit cost is due at the time of placing the order. Moreover, sensitivity analysis on key input parameters will be performed. It is worth mentioning that specific distribution for the lead time should be assumed so that numerical results can be obtained. In this study, we will discuss two special cases for modeling lead time uncertainty; one of them is when lead time follows an exponential distribution and the other one is for normally distributed lead time.
| Status | Finished |
|---|---|
| Effective start/end date | 1/04/22 → 30/09/22 |
Keywords
- Inventory
- stochastic
- Permissible Delay in Payments
- Capacity Constraint
- optimization
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.