Project Details
| Status | Finished |
|---|---|
| Effective start/end date | 1/11/96 → 31/01/98 |
Keywords
- Anchorage (Structural)
- bond (Concrete to steel)
- coatings
- compressive strength
- cover
- crack width and spacing
- development length
- reinforced concrete
- reinforcing steels
- shear properties
- structural engineering.