Abstract
The authors regret that the below update was missed. In page 1686(3.1.1.), line 11 it is written “The selection criteria of NPV is clear: if the NPV is positive and higher than the initial investment outlay of the business, then it should be accepted; otherwise, it should be rejected (Nwogugu, 2017).” We want to change it to: “The selection criteria of NPV is clear: if the NPV is positive and higher than the initial investment outlay of the business, then it should be accepted; otherwise, it should be rejected even though some authors believe NPV is an inappropriate criterion (Nwogugu, 2017)”. *Note: The updated text in bold font. The authors would like to apologize for any inconvenience caused.
| Original language | English |
|---|---|
| Pages (from-to) | 3491 |
| Number of pages | 1 |
| Journal | Energy Reports |
| Volume | 6 |
| DOIs |
|
| State | Published - Nov 2020 |
Fingerprint
Dive into the research topics of 'Corrigendum to “Economic and environmental viability assessment of NASA's turboelectric distribution propulsion” [Energy Rep. 6C (2020) 1685–1695] (Energy Reports (2020) 6 (1685–1695), (S2352484720303322), (10.1016/j.egyr.2020.06.019))'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver