Abstract
This paper addresses the minimal makespan parallel machine problem where machines are subject to preventive maintenance events of a known deterministic duration. The processing time of a job depends on its predecessors since the machine’s last maintenance. The paper proposes some dominance criteria for sequences of jobs assigned to a machine, and uses these criteria to design constructive heuristics to this NP-hard problem. The computational investigation determines the parameters that make a hard instance and studies the sensitivity of the heuristics to these parameters.
| Original language | English |
|---|---|
| Pages (from-to) | 462-479 |
| Number of pages | 18 |
| Journal | International Journal of Production Research |
| Volume | 55 |
| Issue number | 2 |
| DOIs | |
| State | Published - 17 Jan 2017 |
Keywords
- maintenance scheduling
- makespan
- parallel machines
- scheduling
- sequence-dependent systems
Fingerprint
Dive into the research topics of 'Makespan minimisation with sequence-dependent machine deterioration and maintenance events'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver