!!Projects per year
Abstract
This paper addresses the m-machine no-wait flowshop scheduling problem to minimize makespan. We propose two heuristics that are based on simulated annealing and Genetic Algorithm techniques. We also propose improvement procedures to these heuristics. Extensive computational experiments show that the simulated annealing heuristics outperforms the best two existing heuristics. They also show that the improvement procedures, applied to the Simulated Annealing and Genetic Algorithm, result in significant reduction in error, about 750% error reduction to Simulated Annealing and about 1960% to Genetic Algorithm. An important class of scheduling problems is characterized by a no-wait constraint where jobs have to be processed continuously without waiting between or on consecutive machines. This constraint of no-waiting arises from characteristics of the processing technology itself. This paper proposes efficient Simulated Annealing and Genetic Algorithm heuristics for the m-machine no-wait flowshop scheduling problem to minimize makespan.
| Original language | English |
|---|---|
| Pages (from-to) | 1219-1231 |
| Number of pages | 13 |
| Journal | Computers and Operations Research |
| Volume | 30 |
| Issue number | 8 |
| DOIs | |
| State | Published - Jul 2003 |
Keywords
- Genetic algorithm
- Makespan
- No-wait
- Simulated annealing
Fingerprint
Dive into the research topics of 'New heuristics for no-wait flowshops to minimize makespan'. Together they form a unique fingerprint.Projects
- 1 Finished
-
NO-WAIT FLOWSHOPS WITH SEPARATED SETUP TIMES.
Al-Dowaisan, T. A. (PI) & Allahverdi, A. M. (CoI)
1/07/98 → 28/02/01
Project: RESEARCH PROJECT
Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver